Chassis Construction
Under construction at Lothringer Engineering


Page 2
Go To Page:  1  3 
4  5  6  7  8  9  10  11  12   13  14  15  16  17
Back to Contents

 


Chassis out of the jig!

 


Front Bumper and Control Arm Pivot details

 


Foot well area panels being fitted

 


Body panels "roughed out"

 


Lower control arms complete

 


Upper control arms complete

 


Shift linkage tunnel sheetmetal

 


Setting up the trailing arm geometry

 


Windshield, roof and hood sheetmetal
 

 


Looking almost complete
 

 


Interior Detail
 

 


Hood detail

 


Under Hood details

 


Windshield installed in frame

 


Chassis ready for us to bring home!

 

Page 2
Go To Page:  1  3  4  5  6  7  8  9  10  11   12  13  14  15  16  17

Back to Contents

HOME