Chassis Construction
Contents



HOME

Back to Pre-runner Build Main Page

 

Chassis Under Construction at Lothringer Engineering1

Chassis Under Construction at Lothringer Engineering 2

Bringing Our New Baby Home

Initial Assembly/Fabrication

Chassis Disassembly and Paint

Post-Paint Re-assembly (Suspension)

Post-Paint Re-assembly (Driver Controls- Steering, Brakes, Throttle and Clutch Pedals)

Post-Paint Re-assembly (Driver Controls- Shifter and Turning Brake)

Transaxle, Engine and Fuel Cell Installation

Exhaust System and Engine Support Equipment

 Radiator Mounting and Duct Construction

Tires, Wheels and Spare Tire Mounting

Chassis Wrap and Window Nets

Electrics/Electronics/Instruments and Interior

Fuel, Oil and Radiator Plumbing

Electrical System Wiring

Wrapping It Up


Back to Pre-runner Build Main Page

HOME